Hi~welcome to shenzhen xinmu display technology co., ltd.!

News Center

hotline:

13632760729

How to determine the installation location of the LED display screen in Cengong Hotel?

2025-05-26 35

Alas, it’s so wasteful that the wall in your hotel lobby is empty! Have you been urged by your boss to wear LED displays recently? Don’t rush to find a decoration team. Last week, a colleague installed the screen under the fire sprinkler head, but it was stopped directly during acceptance - today I will teach you step by step to avoid these pitfalls!


1. Understand three deadly issues first

​1. "What kind of screen does a hotel really need?"​
Don't be fooled by sales! The wall behind the lobby reception desk and the stage in the banquet hall are all two different things:

岑巩酒店LED显示屏安装位置怎么定?
  • ​Front Office Background ScreenIt must be a "quiet handsome man": the brightness is 800cd/m² enough, focus on itColor Reduction​, the guest's selfie face cannot turn blue!
  • ​Banquet Hall Home Screen​Become the "atmosphere group leader": the refresh rate must be ≥3840Hz, otherwise the wedding video will be full of corrugated
  • ​Exterior wall advertising screenIt must be a "tough guy": brightness ≥5000cd/m², and it must be prevented from acid rain corrosion (Cengong's rainy season is not a joke)

​2. "Where is it installed in which position, it is not illegal?"​
Last year, a hotel suffered a great loss - it was fined 50,000 by the fire brigade by putting the screen at the corner of the escape passage! Remember these three red line areas:
① ≥3 meters away from the safety exit
② ≥1.5 meters from the smoke detector
③ Do not block the fire hydrant mark

​3. "How to adjust the brightness during day and night?"
It is still bright as daytime at 3 a.m., so guests are not allowed to complain? Must choose a belt​Automatic adjustment of light sense​Model:

  • 8 am to 10 pm: 100% brightness
  • 10 pm to 7 AM: 30% soft light mode
  • When it comes to rainy weather, it will automatically increase brightness by 20%

2. Detailed explanation of the four major golden points

1. 1.5 meters behind the lobby reception desk​
This location tests the installation process the most! To reserve​Inspection channel——Leave at least 80cm wide gap, otherwise the ceiling will be removed if you change the power module. Recommended to chooseFront maintenance box​, it can be repaired like pulling a drawer.

2. Inclined surfaces on both sides of the banquet hall stage​
Don't install it directly facing the chandelier! Direct lights will make the screen reflect. The best angle is​List 15° towards the center of the stage​​, so that both the VIPs in the front row and the audience in the back row can see clearly. Remember to let the decoration team be buried​Load-bearing steel frame​, a screen weighs 60 kilograms per square meter!

3. At the corner of the guest hallway
It's best to install here​Bar interactive screen​:

  • 1.2 meters above the ground to facilitate touch control
  • Show conference guidance, restaurant recommendations
  • Automatically switch to luminous clock in the early morning
    But don't forget to do it​Anti-collision-proof edge​, the repair fee for a luggage cart hit is enough to buy a new TV!

​4. Under the parking lot entrance canopy
There are three details to install here:
① The lower edge of the screen is 2.2 meters above the ground and resistant to splashing
② The power cord is worn with galvanized steel pipe to prevent mice from biting
③ Install sun visor to avoid reflection at noon


3. If you step on these pits, you will have to cry.

​"The decoration team said it was OK if you could dress up?"
Last month, a hotel suffered a secret loss - a central air conditioning pipeline was buried in the load-bearing wall, and the condensate pipe was directly blown up during the drilling of holes! Teach you three tricks to prevent pitfalls:

  1. Require the construction party to issueStructural stress report
  2. Use infrared detector to scan the wall
  3. All cable cover metal corrugated tubes

​"Do you want to buy the control system separately?"​
Don't believe it! Regular manufacturers all have their own control system. Last year, a customer was fooled to spend 30,000 more than 10,000 yuan to buy an "imported controller", but the result did not match the screen protocol, and it is still piled up in the warehouse to eat dust...

​"After-sales service said that you should change the accessories yourself?"​
The hotel is hard to wait! Must sign4-hour response terms​:

  • Simple video guide to solve the problem within 2 hours
  • Hardware issues come to the door 24 hours a day
  • On-site support 48 hours before major events

4. The secrets that veteran drivers know

​Five tests that must be done during acceptance​

  1. Play 24-hour extreme test video (quick flash and cut red, green, blue and white pictures)
  2. Turn off the lights to see if there are any dark spots (use white cloth as the background is more obvious)
  3. Water splashing test protection performance (use fire water gun to flush outdoor screen)
  4. Slow motion videos for mobile phones to check ripple
  5. Connect to 10 signal source switching tests at the same time

​The ultimate bargaining tactic
At 3 pm, I took the engineering department manager to the end of the month and said in front of the salesperson: "Our group has eight branches in neighboring provinces to be renovated..." I guarantee that I can get an additional two years of warranty, and then get a free upgrade to the control system!

Maintain calendar table

  • Daily: Check whether the cooling fan is rotating
  • Weekly: Use a brush to clean the ventilation ports
  • Monthly: Tighten all screws (especially areas with large vibrations)
  • Quarterly: Update firmware programs

(Suddenly slap your forehead) By the way! Never install it before the rainy season, as the circuit board will leave hidden dangers when it gets damp. It is best to choose continuous sunny construction. The oven is 72 hours after installation. The temperature is turned on to 55℃ and it can force a hidden fault!


In fact, the most reliable way is to see the installation cases of hotels of the same level. Those manufacturers who have done international hotel chain projects have clear designs on fire protection standards and passenger flow lines. Next time you go on a business trip in other cities, remember to observe the seams and heat dissipation design of other people's screens - good things can speak by themselves!

for more product information and pricing, please contact us .

Shenzhen New Screen Display Technology Co.Ltd