Are newbies who are new to LED display installation often confused by the position of the power switch? Especially when I heard that I wanted to use a 4 square power cord, my mind was full of questions: Where to connect this cord? Is the switch installed on the wall or hidden behind the machine? Today, I will use years of practical experience to break it apart for you and explain it clearly - how novices can quickly master the power layout skills in LED screen installation.
Friends who can't figure out the position of the power switch are most likelyThe preparations before installation are not in place. Just like when you don’t prepare all the ingredients for cooking, there will definitely be problems when you are busy. Let me talk about a few key points first:
The core question is - where is the 4-square-wire power switch installed?According to our experience in making plans for clients in more than 110 countries, there are three main situations:
Ceve concealed installation
Suitable for high-end places such as shopping malls and exhibition halls, hiding the air switch in the ceiling maintenance port. Two points to pay attention to:
Surface-mounted wall
The most common way, but many people make low-level mistakes:
Cabinet integrated
This method is commonly used for professional performance rental screens, and the key points are to look at two points:
After determining the switch position, the next step is the highlight - connecting to the 4 square power cord. Newbie often fail in these places:
Tied thread processing
The stripping length is most suitable for controlling the length of the wire at 1.2cm. It is too short and poor contact, and it is easy to short circuit if it is too long. I have seen someone who strips the wire with a utility knife, and cuts the copper wire halfway (Web page 2)
Terminal crimping
Must useHydraulic clampsCrimped OT terminals, manual twisting can't withstand high current at all. Last year, a customer used a hand twist, and the terminal was melted after half a year (Web page 6)
Phase assignment
Three-phase electrical distribution must be followedThe principle of equal division of red, yellow and blue, don't connect all live wires to the same phase. The most outrageous case we engineers have ever brought - three live wires are connected to phase A, which leads to tripping (Web page 5)
Grounding inspection
When using a multimeter to measure the ground resistance, many novices directly measure the ground wire to the neutral voltage. The correct method isGround resistance to ground ≤3Ω(Web page 8)
Power-on test
Do not turn on the main gate directly when powering on for the first time! You have to take your pulse like an old Chinese doctor:
Q: Why does my switch always trip?
A: Ninety percent of these three issues:
Q: Can multiple small switches be used instead of the main control?
A: A big taboo! We have done a comparison experiment:
After all, the position of the power switch is not metaphysical, but a systematic engineering that can be traced. Next time you encounter installation problems, remember these eight-character tips:"Power calculation, short path". Just like the project our company has done for Tokyo Gymnasium, we used BIM modeling to rehearse all the routes in advance, and the on-site installation is passed the acceptance. Although I am talking so carefully now, I also worked hard on the construction site to pay a lot of tuition fees. I hope these practical experiences can help novices avoid detours for two years.