Hi~welcome to shenzhen xinmu display technology co., ltd.!

News Center

hotline:

13632760729

LED screen transformer procurement guide, full analysis of professional scenario adaptation

2025-06-11 61

​How many pitfalls are there when choosing the wrong transformer? These parameters directly determine the success or failure of the project​
Last week, I encountered a case: Due to insufficient transformer power, the LED advertising screen in a shopping mall experienced a color block fault after three months of operation, and the maintenance fee was as high as 45% of the equipment model. This just shows that​The adapted transformer is the heart of the display for stable operation​​. Today we will break through and talk about the purchasing path.


​1. Three accounts that must be settled before purchasing​
​Power matching is the line of life and death​:

LED屏变压器采购指南,专业场景适配全解析
  • Total power = screen area × power consumption per square meter (regular P4 screen is about 650W/㎡)
  • 20% redundancy is reserved, for example, a 10㎡ screen needs to be equipped with a 7800W transformer
  • ​Intelligent power distribution system​Can dynamically adjust the load, and the measured energy saving is 31%

​The protection level depends on the environment​:

  • Open-air scene identification​IP65 waterproof and dustproof certification​(You can carry it on rainy days)
  • Stage floor tiles screen​Compression and shock-resistant structure​(Load bearing ≥2 tons/㎡)
  • Need to high altitude areas​Wide temperature range design​(-40℃~85℃ start normally)

​Certification qualification cannot be saved​:

  1. ​CCC compulsory certification​(Domestic market entry threshold)
  2. CE certification​ (Enough to export to the EU)
  3. ​RoHS Test Report​​(Environmental Protection Requirements)

​2. Customized solutions for professional scenarios​
​Special needs of stadiums​​:

  • Fence screen transformer requiresAnti-glare coating​ (Reduce athletes' sight interference)
  • Scoring system supporting​Dual loop power supply(Zero power outage during the event)
  • ​Instantaneous overload protection​Correspond to the sudden increase in current when the audience cheers

​The key points of smart city projects​:

  • Traffic induction screen adaptationWide voltage input​(90V-305V adaptive)
  • Street light pole screen equipped​Anti-theft lock​+​Lightning protection module
  • Connecting to the city's power grid requiresHarmonic Suppression Technology​(THD<5%)

​Hidden configuration of cultural and tourism projects​​:

  • For water curtain projection​Full seal glue filling transformer​(Wettproof grade IP68)
  • Interactive floor tiles screen selectionUltra-thin design​(Thickness ≤35mm)
  • The sound-optical linkage system must​Millisecond response​(Delay <0.3ms)

​3. The open rules and hidden thunder of procurement channels
​The three major traps of online procurement​​:

  • Fake power (30% off on actual measured load rate)
  • Second-hand renovation (check the SN code factory date)
  • Parameter fraud (requires third-party testing report)

​Must check for offline factory inspection​​:

  1. Is there any production workshop?Aging test line​(48 hours continuous load test)
  2. Is the warehouse ready?Emergency replacement parts​(Inventory type ≥200SKU)
  3. Does the technical team have it?Custom development capabilities​(Non-standard delivery cycle ≤7 days)

​Hidden value of after-sales service​​:

  • ​Five-year warrantyMore important than price (annual maintenance cost difference of 3.8 times)
  • Localized service outlets​Determine the response speed (arrival 4 hours after emergency failure)
  • ​Remote monitoring system​Advance warning for faults (accuracy rate of 92%)

Now you should understand that buying a transformer is not a simple price comparison game. When purchasing next time, you might as well bring the screen parameter list and the scenario demand table to negotiate - it can be quickly given​Three-dimensional heat dissipation solution​andEnergy efficiency optimization suggestionsThe supplier is the real professional player. After all, for manufacturers that can achieve transformer efficiency of more than 95%, the screen failure rate is usually 67% lower than the industry average, which is a real worry-free way.

for more product information and pricing, please contact us .

Shenzhen New Screen Display Technology Co.Ltd