Hi~welcome to shenzhen xinmu display technology co., ltd.!

News Center

hotline:

13632760729

Where to find LED electronic display screen? Please collect this guide to avoid pits

2025-06-03 14

"Boss, who should I look for when I want to install a large LED screen in the mall?" Last week, I heard that the merchant was calling for a price inquiry. I really can’t just look for this matter. Let’s make a clear decision today - where should I look for a reliable LED electronic display?


1. The doorways hidden in common installation sites

1. The location of the three treasures of commercial complex

  • ​Elevator waiting area​ (A must-see if you are bored while standing)
  • Atrium lifting area (the best effect is 8-10 meters away from the ground)
  • Exterior facade of the brand flagship store (with dynamic display with the window)

Last year, I installed it for a milk tea chain86% transmissiveness window screen​, three months have led to a 27% increase in new product sales. Key reminder: Never install the screen under the fire roller shutter door, otherwise the acceptance will be blocked!

LED电子显示屏哪里找?这份避坑指南请收好

2. Four golden points of transportation hub

  • At the corner of the subway transfer channel (average daily traffic volume of 30,000+)
  • Above the ticket gate of the high-speed rail station (you can see it when you look up)
  • Airport luggage carousel area (high advertising conversion rate while waiting)
  • Bus station shelter (1.2 meters away from the ground most suitable)

Lessons from blood and tears: A bus station installed the screen at a height of 2.5 meters, but the passenger looked up with his neck, and the merchant withdraws the advertisement three months later.


3. Three new ways to play in special scenarios

  • Gym equipment area​Interactive floor tiles screen(Real-time display of motion data)
  • The number call screen of the hospital pharmacy (with voice prompts more considerate)
  • Folding screen in the school auditorium (can be closed when not in use to save space)

Tell me the truth: it is used for a music festival​Quickly disassemble and install rental screens​​, 8 people set up a 200㎡ stage background in two hours, saving 60% labor costs compared to the traditional plan.


2. Five hard indicators for selecting suppliers

1. The technical parameters must be more serious

  • Refresh rate ≥1920Hz (no flashing when shooting videos)
  • Intelligent brightness adjustment (withindoor exceeding 1200 nits)
  • Protection level is at least IP54 (outdoor screen can withstand heavy rain)

2. The product type must be the right way

  • Select regular screen for advertising
  • Rental screen for stage performance
  • Building decoration transparent screen
  • A must-have high-protection screen in stadiums

3. Three points to production strength

  • Only factories with a monthly production capacity of over 10,000 square meters are reliable
  • There must be a full-process quality inspection report
  • Check whether there is a dust-free production line in the workshop

4. Focus on service guarantee

  • 24-hour technical response
  • Starting with a five-year warranty
  • Provide installation qualification documents
  • Dare to sign a brightness attenuation compensation agreement

5. See details from case experience

  • Have you ever made a curved screen?
  • Have you dealt with extreme weather projects?
  • Is there enough experience in overseas projects

3. Guide to prevent pits on the cost list (taking 100㎡ as an example)

projectAverage market priceHidden pitPit prevention skills
The screen itself600,000-800,000Use second-hand lamp beads to impersonate new productsRequires the life of the lamp beads to be disassembled
Control system30,000-50,000Pirated software pit stabilityA software copyright certificate must be provided
Steel structure80,000-120,000False report of steel thicknessOn-site measurement with vernier caliper
Three years of maintenance60,000-90,000Only change but not fix routinesSign up the replacement price of accessories

4. Real project timeline (must be required for lightning protection)

  1. Demand confirmation: 3 days (don't rush to sign the contract!)
  2. Plan design: 5 days (at least 3 drafts are modified)
  3. On-site construction: 7 days (at least 3 days of buffering are reserved on rainy days)
  4. Debugging training: 2 days (Church use is more important than anything else)
  5. Acceptance and maintenance: 1 year (focus on color consistency checking)

Tips for saving electricity and money

  1. ​Intelligent dimming system​​Can save 35% of electricity bill (auto dimming in the early morning)
  2. Choose a model with graphene heat dissipation box (save 80,000 maintenance fee in five years)
  3. Modular design is broken and replaced (70% savings than full screen maintenance)
  4. Bookings for the first three months of the peak season (can bargain 15%-20%)

Personal insight time

After working in this industry for more than ten years, I found an interesting phenomenon: I would rather spend 50,000 more customers on the control system, and the later failure rate can be reduced by 60%. Just like buying a car, the engine (light bead) is important, and the gearbox (control card) is even more important!

Now new​Low bright high gray technology​It smells so good. Last time I saw a screen used in a conference room. I could see clearly without pulling the curtains at noon, so I didn’t have to wear sunglasses to see. If you ask me, finding an LED screen is like finding a partner - you can keep your eyes wide open before marriage (strict screening) and close your eyes after marriage (regular maintenance), so that you can live a long life!

for more product information and pricing, please contact us .

Shenzhen New Screen Display Technology Co.Ltd